CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

J Cleo Thomson

Year Submitted: 2008

Process: Chemical Storage and Delivery

Industry: Chemical Manufacturing

Wastes Reduced: GHG-Crude Oil

Location: Odessa TX

Contact: Jim Stevens

Phone: 432-550-8887



Description:

1

P2 Application:

1

Video: 1

  • Total Cost Savings: $5,000.00

Details of Reductions


  • Comments: The method 21 test results showed a reduction from 80,000+ppm (flamed out equipment) to average of 8,000 ppm (spiked at 12,000). The IR camera video was very impressive, with dark cloud of vapors without filter pillows, to very light, (almost non-detectable) source with filter pillows in place. More test are forthcoming, including accurate flow rate (estimate of 5 cfm), H2S reductions and Telp tets for Benzene levels. The tank battery has (3) 500 barrel oil tanks and (1) water tank single manifold to a Enardo Valve set at 8oz.

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off