Zero Waste Logo The Zero Wate Network the University of Texas at Arlington Center for Environmental Excellence Environmental Training Institute Logo  

Join Us on:

Social Network Nav Bar

Lean and P2 Workshops

 

Lean and P2 Workshops

Denver
05/28/14 - 05/30/14

San Antonio
06/04/14 - 06/06/14

Bozeman
08/12/14 - 08/14/14

Arlington
09/23/14 - 09/25/14

New Orleans
10/22/14 - 10/24/14

Houston
11/18/14 - 11/20/14


more...

 

Environmental Management Systems Workshops

Houston
06/17/14 - 06/20/14

Rock Springs
08/05/14 - 08/08/14

Little Rock
10/14/14 - 10/17/14

 


more...

Case Study Database

           Add Story    |    Search Case Studies    |   

 

H-R Industries

Year Submitted: 2003

Process: Circuit Board Soldering

Industry: Electronics Manufacturing

Wastes Reduced: Wastewater

Substance: Tin/Lead

Equipment: Etch Resist

Location: Richardson TX

No. of employees: 100

Contact: Gary C. Roper

Phone: (214) 301-6600



Description:

Over the period of a year our product mix changes from producing 90% solder coated circuits to producing 80% solder mask over bare copper (SMOBC) circuits. In both processes tin lead was plated over the circuits to act as an etch resist. The tin lead is stripped off after etch on SMOBC product. The change in product mix increased the lead in the influent to waste treatment from 1 mg/l to 35 mg/l in a 50 gpm system. This is an increase of approximately 2,300 kg per year of lead added to our sludge. The etch resist plating was changed to acid tin for SMOBC boards reducing the influent to waste treatment to below original levels.

P2 Application:

Electroplating tin, etching the base copper, striping the tin, masking over the copper circuits, and applying solder by hot air solder level to only the holes allows for less lead on the finished product and no ionic forms of lead in high concentrations in the production process.

Environmental Benefits:

The process change reduced the amount of lead in the waste water treatment sludge by 5,000 pounds per year just from rinse water. This reduced sludge generation by 52 drums per year. The 3,300 gallons of stripping solution which averaged over 10 g/l was condensed and disposed of off-site. Now that the stripping solution no longer contains lead it is treated in house with other corrosive solutions, reducing the lead waste by 275 pounds per year and reducing liability

Details of Reductions

Additional Information :

The savings in reduced disposal cost is $14,000 per year. The project cost was $20,000 thus pay back will be 1.5 years.

Source: TCEQ



SHEP Shield
Safety
Health and
Environmental
Professional



ERP Shield
Environmental
Regulatory
Professional



ESP Shield
Environmental
Science
Professional



EMP Shield
Environmental
Management
Professional

Attend a workshop and
earn credits toward a
Professional Certification

 

 



The Zero Waste Network is one of eight Pollution Prevention Resource Exchange P2RxCenters , serving as a national network of regional information centers: NEWMOA (Northeast), WRRC (Southeast), GLRPPR (Great Lakes), ZeroWasteNet (Southwest), P2RIC (Plains), Peaks to Prairies (Mountain), WSPPN (Pacific Southwest), PPRC (Northwest). We are a proud member of the National Pollution Prevention Roundtable.

National P2 Roundtable Logo