Zero Waste Logo The Zero Wate Network the University of Texas at Arlington Center for Environmental Excellence Environmental Training Institute Logo  

Join Us on:

Social Network Nav Bar

Lean and P2 Workshops

New Orleans, LA
10/15/14 - 10/17/14

Seattle, WA
10/28/14 - 10/30/14

Arlington, TX
11/04/14 - 11/06/14

Houston, TX
11/18/14 - 11/20/14

 

More...

 

Environmental Management Systems Workshops

Little Rock, AR
10/14/14 - 10/17/14

Arlington, TX
03/03/15 - 03/06/15

Houston, TX
04/07/15 - 04/10/15

Albuquerque, NM
05/12/15 - 05/15/15

 

More...

Case Study Database

           Add Story    |    Search Case Studies    |   

 

CNH-Case Corporation

Year Submitted: 2006

Process: Painting/Coating

Industry: Industrial Equipment Manufacturer

Wastes Reduced: VOC and Wastewater

Location: Burlington IA

No. of employees: Unknown

Contact: Jeff Fiagle

Phone: 515-281-4367



Description:

CNH-Case Corporation is a world leader in the production of agricultural and construction equipment. Revenues in 2002 totaled $10 billion. The Burlington facility assembles tractor loader backhoes and forklifts. CNH-Case Corporation wanted to lower its corporate Paint Exposure Index (PEI) Score, reduce Volatile Organic Compound (VOC) emissions, reduce water usage and reduce solid waste generation.

P2 Application:

Reroute Rinse Water: CNH-Case has implemented a plumbing scheme that takes water from one rinse stage of the e-coat rinse system and uses it in two other rinse stages. Implementation costs were about $2,900. The payback period for this project is five months. Water use was reduced by 4 million gallons per year, with a savings in both water and sewer costs.

Non-Scheduled Compactor Pickup: Case has one trash compactor on twice-weekly scheduled pickup. Receipts from Waste Management show that this compactor was being sent to the landfill with an average weight of 2 tons. The compactor is capable of holding load weights of 6 to 8 tons. If this compactor were picked up once every 10 days instead of twice weekly, economic savings could be as much as $8,800 in the form of saved hauling fees. Environmental savings, because of reduced travel with the compactors, amount to approximately 150 gallons of gasoline.

  • Total Cost Savings: $16,300.00

Details of Reductions

  • 4,000,000.0 - Gallons of   Water
    Comments: Reroute Rinse Water
  • 150.0 - Gallons of   Gasoline
    Comments: Non-scheduled compactor pickup

Additional Information :

More information about this project can be found here at the Iowa DNR P2 Intern web site.

Source: Iowa DNR



SHEP Shield
Safety
Health and
Environmental
Professional



ERP Shield
Environmental
Regulatory
Professional



ESP Shield
Environmental
Science
Professional



EMP Shield
Environmental
Management
Professional

Attend a workshop and
earn credits toward a
Professional Certification

 

 



The Zero Waste Network is one of eight Pollution Prevention Resource Exchange P2RxCenters , serving as a national network of regional information centers: NEWMOA (Northeast), WRRC (Southeast), GLRPPR (Great Lakes), ZeroWasteNet (Southwest), P2RIC (Plains), Peaks to Prairies (Mountain), WSPPN (Pacific Southwest), PPRC (Northwest). We are a proud member of the National Pollution Prevention Roundtable.

National P2 Roundtable Logo