Zero Waste Logo The Zero Wate Network the University of Texas at Arlington Center for Environmental Excellence Environmental Training Institute Logo  

Join Us on:

Social Network Nav Bar

Lean and P2 Workshops

Arlington
10/13/15 - 10/15/15

South Houston
11/10/15 - 10/12/15

New Orleans
TBD

Chicago
TBD

 

More...

 

Environmental Management Systems Workshops

Albuquerque, NM
05/12/15 - 05/15/15

Galveston, TX
07/28/15 - 07/31/15

Austin, TX
09/22/15 - 09/25/15

Arlington, TX
11/17/15 - 11/20/15

 

More...

Case Study Database

           Add Story    |    Search Case Studies    |   

 

CNH-Case Corporation

Year Submitted: 2006

Process: Painting/Coating

Industry: Industrial Equipment Manufacturer

Wastes Reduced: VOC and Wastewater

Location: Burlington IA

No. of employees: Unknown

Contact: Jeff Fiagle

Phone: 515-281-4367



Description:

CNH-Case Corporation is a world leader in the production of agricultural and construction equipment. Revenues in 2002 totaled $10 billion. The Burlington facility assembles tractor loader backhoes and forklifts. CNH-Case Corporation wanted to lower its corporate Paint Exposure Index (PEI) Score, reduce Volatile Organic Compound (VOC) emissions, reduce water usage and reduce solid waste generation.

P2 Application:

Reroute Rinse Water: CNH-Case has implemented a plumbing scheme that takes water from one rinse stage of the e-coat rinse system and uses it in two other rinse stages. Implementation costs were about $2,900. The payback period for this project is five months. Water use was reduced by 4 million gallons per year, with a savings in both water and sewer costs.

Non-Scheduled Compactor Pickup: Case has one trash compactor on twice-weekly scheduled pickup. Receipts from Waste Management show that this compactor was being sent to the landfill with an average weight of 2 tons. The compactor is capable of holding load weights of 6 to 8 tons. If this compactor were picked up once every 10 days instead of twice weekly, economic savings could be as much as $8,800 in the form of saved hauling fees. Environmental savings, because of reduced travel with the compactors, amount to approximately 150 gallons of gasoline.

  • Total Cost Savings: $16,300.00

Details of Reductions

  • 4,000,000.0 - Gallons of   Water
    Comments: Reroute Rinse Water
  • 150.0 - Gallons of   Gasoline
    Comments: Non-scheduled compactor pickup

Additional Information :

More information about this project can be found here at the Iowa DNR P2 Intern web site.

Source: Iowa DNR



SHEP Shield
Safety
Health and
Environmental
Professional



ERP Shield
Environmental
Regulatory
Professional



ESP Shield
Environmental
Science
Professional



EMP Shield
Environmental
Management
Professional

Attend a workshop and
earn credits toward a
Professional Certification

 

 



The Zero Waste Network is one of eight Pollution Prevention Resource Exchange P2RxCenters , serving as a national network of regional information centers: NEWMOA (Northeast), WRRC (Southeast), GLRPPR (Great Lakes), ZeroWasteNet (Southwest), P2RIC (Plains), Peaks to Prairies (Mountain), WSPPN (Pacific Southwest), PPRC (Northwest). We are a proud member of the National Pollution Prevention Roundtable.

National P2 Roundtable Logo
michael kors online outlet michael kors factory outlet online store michael kors outlet canada michael kors outlet online michael kors factory outlet fake michael kors bags cheap mk bags michael kors handbags clearance wholesale jordans jordans outlet cheap jordans china cheap authentic jordans cheap real jordans cheap jordans free shipping cheap jordans online discount jordans cheap jordans from china cheap air jordans louboutin pas cher louboutin soldes louboutin pas cher louboutin soldes air max pas cher air max femme pas cher air max pas cher roshe run pas cher air max one pas cher air max femme pas cher sac michael kors pas cher sac michael kors pas cher sac longchamp pas cher longchamp soldes sac longchamp pas cher longchamp pas cher moncler outlet moncler outlet moncler outlet