CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

Molex, Inc.

Year Submitted: 2006

Process: Process controls

Industry: Plating

Wastes Reduced: Electricity

Location: Lincoln NE

No. of employees: 695

Contact: Stacey Hawkey, CIH

Phone: (402) 472-2838



Description:

1

P2 Application:

1

Video: 1

  • Total Cost Savings: $103,940.00

Details of Reductions

  • 43,929.0 - of   Energy
    Comments: VFD Fan Motor On Cooling Tower
  • 1,652,432.0 - of   Energy
    Comments: Changing Plating Blowoff Nozzles
  • 133,025.0 - KwH of   Energy
    Comments: Reducing Plating Blowoff Pressure After Changing Nozzles 3(psi)
  • 648,272.0 - KwH of   Energy
    Comments: Fix Air Leaks
  • 2,990.0 - KwH of   Energy
    Comments: Ultrasonic Detectors In Bathrooms

Additional Information :

1

Source: UNL P3 Program
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off