CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

Corpus Christi Army Depot

Year Submitted: 2003

Process: Plating

Industry: Military

Wastes Reduced: Hazardous Waste

Substance: Cadmium, Cyanide

Equipment: Ion Deposition

Location: Corpus Christi TX

No. of employees: 3500

Contact: Steve R. Connor

Phone: (512) 939-2733



Description:

1

P2 Application:

1

Environmental Benefits:

The system currently reduces the generation of hazardous waste by 4,336 pounds per year. Reduced use of toxic materials also reduces the potential for worker exposure. Water savings were also very signifant, about 3,000,000 gallons per year by going to a closed loop system.

Video: 1

Details of Reductions

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off