CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

3M Company

Year Submitted: 2003

Process: Electricity Generation

Industry: Electronics Manufacturing

Wastes Reduced: Energy

Location: Austin TX

No. of employees: 1400

Contact: Bonnie Pepin

Phone: (512) 984-5996



Description:

1

P2 Application:

1

Environmental Benefits:

The cost for the modification was approximately $330,000. The modification of the cogeneration engines produced savings of $126,000 per year in energy costs. The U.S. EPA issued an award for this significant pollution prevention project.

Video: 1

Details of Reductions

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off