CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

Valero Refining

Year Submitted: 2003

Process: Slurry Deashing

Industry: Petroleum Refining

Wastes Reduced: Catalyst

Location: Corpus Christi TX

No. of employees: 485

Contact: Allan Schoen

Phone: (512) 289-3288



Description:

1

P2 Application:

1

Environmental Benefits:

The average, annual generation of residue prior to SDAP was about 3,000 tons/yr. Since implementing the project the average residue generation has been about 400 tons/yr. Reducing the rate of residue deposition means that the tanks need to be cleaned out less frequently.

Video: 1

Details of Reductions

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off