CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

Carrier Corporation

Year Submitted: 2003

Process: Bending Metal Tubes

Industry: Metal Fabrication

Wastes Reduced: Waste Oil

Equipment: Precoated Steel

Location: Tyler TX

No. of employees: 1000

Contact: Jim McFarlane

Phone: (903) 510-7476



Description:

1

P2 Application:

1

Environmental Benefits:

Going from a solvent based system to precoated steel eliminated paint waste, paint sludge, air emissions and wastewater. Precoated steel eliminate over 80 tons of soild hazardous waste that Carrier generated as well as 12,000 pounds of VOC emissions, an important factor since the Tyler area is a near non-attainment area for ozone.

Video: 1

Details of Reductions

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off