CASE STUDY DATABASE

Add Story    |    Search Case Studies   

 

Texas Instruments

Year Submitted: 2010

Process: Thermal Oxidizers

Industry: Semiconductor Manufacturing

Wastes Reduced: NOx

Location: Dallas TX

No. of employees: 11500

Contact: Tina Gilliland

Phone: 214-567-4881



Description:

1

P2 Application:

1

Video: 1

  • Total Cost Savings: $900,617.00
  • Comments: This data covers three system installations over a two-year period. Each metric is based on measurements before and after installation of the catalyst.

Details of Reductions

  • 13.6 - ton of   NOx
  • 2,635,910.0 - Select Below: of   GHG
    Comments: (CO2 equivalents)
  • 51.7 - Select Below: of   Natural Gas
    Comments: MMBTU
  • 106.0 - ton of   Packing Material

Additional Information :

1

Source: TCEQ
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off